NOTICE:
From any post click the photo across the page top to see the entire blog.
JAMES' PERSONAL WRITINGS: SLOVING
JAMES' MOST STRATEGIC POSTS: *****
MUCH OF MY POSTING WAS ON FACEBOOK: STARTLOVING1

9.29.2019

Workday tomorrow in Grand Junction. Upgrades and repairs. Then the next six days.




It is possible that the motor is not destroyed. And because we have two Motors, one which has barely been used in the rear wheel, but now offsets the near-
fatal symptoms, with a day's worth of work tomorrow should be good to go. Items for tomorrow include drilling holes in the motor cover to allow for evaporation with heat. Shocking but true. And removing rust and corrosion and applying a rust preventive. Also further waterproofing the back of the vehicle which in earlier storm around allowed water to answer which destroyed the $260 inverter which has now been replaced. We would rather not have that one destroyed. Several measures have been identified which should greatly protect the new inverter.

Oh, and a particularly nasty job but for once we'll be doing it on our own terms, repairing, replacing, the warn rear tire and the warn sprockets on either side, a terrible 3-hour job, but, oh well.

Wow, and maybe we'll even replace the major drive chain, a 10-minute job, that poor current chain stretches like taffy under all this weight requiring constant adjustment.

And, if all that goes as planned, probably a third trip late afternoon to the $10 extraordinary huge beautifully done all you can eat asian Buffet. Grand International Buffet  James body is now happily and dutifully providing at least 25% of each day's energy and this is an extraordinary place to fuel and protect that motor and Battery. In case you missed it, this was the last ride

No comments:

Post a Comment